1 Month to Go @ Michael Jordan Collision
We are coming down to the wire at the Micheal Jordan Collision Center project in Durham, NC. With a month to go, work is at a fever pitch. After a week or so of bad weather, work has picked up …
We are coming down to the wire at the Micheal Jordan Collision Center project in Durham, NC. With a month to go, work is at a fever pitch. After a week or so of bad weather, work has picked up …
Work on the inside of the building progressed now that the fire protection permit was released. Work on the outside, however, was stymied by wet weather, again. Installation of the high sprinkler pipe is well underway and away from the …
[vimeo 166551673 w=640 h=427] Progress picked back up this week after substantial weather and jurisdictional delays attempted to delay the Michael Jordan Collision project in Durham, NC. Several inches of rain have fallen in the last week and a half …
The front entry canopy steel went up this week for the Michael Jordan Collision Center project in Durham, NC. Schulz Ironworks from Raleigh threw up the canopy in 2-1/2 days with only the perforated metal sign panel left to be installed …
Fire Line installation is well underway for the Michael Jordan Collision Center project in Durham, North Carolina. Since we are converting a 30+ year old warehouse into a body shop, the building is required to sprinklered (it is not sprinklered, …
Another surprise, some more red tape, and a lot of progress this week at Michael Jordan Collision Center in Durham, NC. Michael Jordan Collision Center Sink Hole from Eddie Gontram on Vimeo. The latest surprise was the sudden appearance of a …
Two months to go at the Michael Jordan Collision Center project in Durham, NC. Michael Jordan Collision Center Timelapse 2016-04-01 from Eddie Gontram on Vimeo. The interior concrete work is now complete, allowing metal stud framing for the customer and …
Another busy week has flown by at the Michael Jordan Collision Center project in Durham, NC. Concrete has been placed for the walls at the front entrance area. The remaining interior slab tie-ins were poured, and the vehicle ramp was just …
During the past week, a lot of concrete has been poured at the Michael Jordan Collision Center project in Durham, NC. Concrete has been placed for both walls and floors. Walls were formed and poured for the exterior front entry …
Michael Jordan Collision Timelapse Video 2016-03-11 from Eddie Gontram on Vimeo. Work on the Michael Jordan Collision Center (Durham, NC) progressed this past week with lots of foundation work, painting, overhead door installations, and other activities. Foundation work proceeded at …