“Thanks, Eddie! Turned out Great! Another well run project that we are very happy with. Looking forward to the next one!” – Ray Vrscak, Owner. The new Michael Jordan Collision Center is now open for business in Durham, NC. This project …
Lots of hard work coming together in the last few weeks of the Michael Jordan Collision Center project in Durham, NC. Work recently completed includes VCT flooring, ceramic tile, cabinetry, ceiling tile installation, and more. On the exterior, the front driveway …
Coming down to the last few weeks of the Michael Jordan Collision Center project in Durham, NC. Work recently completed includes prime paint, ceiling grid, lighting, ductwork, above ceiling inspections, and more. On the exterior, the rear drive was poured, …
Another busy week just ended at the Michael Jordan Collision Center project in Durham, NC. Interior finishes are well under way. Walls have been finished and sanded, so prime paint is going on. Wall angle and hanger wire for the …
We are coming down to the wire at the Micheal Jordan Collision Center project in Durham, NC. With a month to go, work is at a fever pitch. After a week or so of bad weather, work has picked up …
Work on the inside of the building progressed now that the fire protection permit was released. Work on the outside, however, was stymied by wet weather, again. Installation of the high sprinkler pipe is well underway and away from the …
[vimeo 166551673 w=640 h=427] Progress picked back up this week after substantial weather and jurisdictional delays attempted to delay the Michael Jordan Collision project in Durham, NC. Several inches of rain have fallen in the last week and a half …
The front entry canopy steel went up this week for the Michael Jordan Collision Center project in Durham, NC. Schulz Ironworks from Raleigh threw up the canopy in 2-1/2 days with only the perforated metal sign panel left to be installed …
Fire Line installation is well underway for the Michael Jordan Collision Center project in Durham, North Carolina. Since we are converting a 30+ year old warehouse into a body shop, the building is required to sprinklered (it is not sprinklered, …