Fire line installation underway

Fire line installation underway

Hydrant and valve installation

Hydrant and valve installation

Rough grading at rear drive

Rough grading at rear drive

The front entry canopy steel went up this week for the Michael Jordan Collision Center project in Durham, NC.  Schulz Ironworks from Raleigh threw up the canopy in 2-1/2 days with only the perforated metal sign panel left to be installed next week.  The canopy is one of the finishing touches on the much upgraded entrance of this former warehouse building.

Also, well underway is installation of the fire line that will soon provide water for the new fire sprinkler system that is required for the building.  Since this is a relatively large body shop, the North Carolina Building Code requires the building be completely protected by fire sprinklers.

On the interior, installation continues for the paint booths and prep decks.

New front entry canopy

New front entry canopy

Prep deck installation underway

Prep deck installation underway

This project is being provided to the Owner via the Architect-led Design-Build process with Ten Penny Construction.