1 Month to Go @ Michael Jordan Collision
We are coming down to the wire at the Micheal Jordan Collision Center project in Durham, NC. With a month to go, work is at a fever pitch. After a week or so of bad weather, work has picked up …
We are coming down to the wire at the Micheal Jordan Collision Center project in Durham, NC. With a month to go, work is at a fever pitch. After a week or so of bad weather, work has picked up …
Work on the inside of the building progressed now that the fire protection permit was released. Work on the outside, however, was stymied by wet weather, again. Installation of the high sprinkler pipe is well underway and away from the …
[vimeo 166551673 w=640 h=427] Progress picked back up this week after substantial weather and jurisdictional delays attempted to delay the Michael Jordan Collision project in Durham, NC. Several inches of rain have fallen in the last week and a half …